Milestones

1991

Began operations in Merida, Mexico with Sales and Engineering office in Miami (USA).

1995

First 2000 turn high inductance CTs for Electronic Watt Hour Meters.

1996

Mexican facility certified ISO 9002.

Established operations in China, Dongguan, PRC.

1998

New 6500 square meters plant in Merida, Mexico.

China plant certified ISO 9002.

2001

Mexican plant certified ISO 9001.

2002

Established Falco Electronics Xiamen; a WFOE with a USD 4m capital contribution. Initial plant size was 8,200 square meters.

2004

Purchased 85% of KAYPEE India and expanded production capabilities.

2005

Moved Falco Electronics Xiamen to a new 29k square meter campus.

2006

Testing of cores for CTs.

Wire bunching.

Purchased CRS.

2008

Big Blue product.

ISO 14000.

Mexican plant vertical integration of the meter base assembly: molding, stamping and plating.

2009

Base plates introduced.

Electro plating.

2010

Auto testing.

2014

Winding on round aluminum wire.

2015

KPE Tumkur 15,000 square meter plant.

2017

Relays for base plates.

2018

Winding on rectangular aluminum wire.

2021

Silicon steel laminated core for Instrument Transformers.

2022

Plant 6 FEM.

2023

Meter Collar.

Salzgitter Cabinet for CRS.

Powder coated cabinet enclosures and assembly of large inverters and DC/DC converters.

Instrument Transformers introduction.

2024

System testing.

2025

PCBA.

FAS US1.