Milestones

Feb 1991

Began operations in Merida, Mexico with Sales and Engineering office in Miami (USA).

June 1995

First 2000 turn high inductance CTs for Electronic Watt Hour Meters.

June 1996

Mexican facility certified ISO 9002.

Nov 1996

Established operations in China, Dongguan, PRC.

Feb 1998

New 6500 square meters plant in Merida, Mexico.

Jun 1998

China plant certified ISO 9002.

Jul 2001

Mexican plant certified ISO 9001.

Jan 2002

Established Falco Electronics Xiamen; a WFOE with a USD 4m capital contribution. Initial plant size was 8,200 square meters.

Feb 2004

Purchased 85% of KAYPEE India and expanded production capabilities.

Oct 2005

Moved Falco Electronics Xiamen to a new 29k square meter campus.

March 2006

Testing of cores for CTs.

2006

Wire bunching.

April 2006

Purchased CRS.

Jan 2008

Big Blue product.

2008

ISO 14000.

2008

Mexican plant vertical integration of the meter base assembly: molding, stamping and plating.

March 2009

Base plates introduced.

2009

Electro plating.

2010

Auto testing.

2014

Winding on round aluminum wire.

2015

KPE Tumkur 15,000 square meter plant.

June 2017

Relays for base plates.

2018

Winding on rectangular aluminum wire.

2021

Silicon steel laminated core for Instrument Transformers.

2022

Plant 6 FEM.

2023

Meter Collar.

Sept 2023

Salzgitter Cabinet for CRS.

2023

Powder coated cabinet enclosures and assembly of large inverters and DC/DC converters.

2023

Instrument Transformers introduction.

2024

System testing.

2025

PCBA.

2025

FAS US1.